Maps, Presentations and Reports
Presentations
- October 16, 2008 Alternatives Public Meeting Presentation
- April 10, 2008 Presentation for MTPO
- March 11, 2008 Board of County Commissioners Presentation
- February 26, 2008 Presentation to Board of County Commissioners
- Metropolitan Transportation Planning Organization (MTPO) Website
- November 2007 Alternatives Public Meeting Video (streaming video, Requires Adobe Flashplayer)
- August 2007 Public Kickoff Meeting (.ppt) (3.5MB)
- August 2007 Public Kickoff Meeting (streaming video, Requires Adobe Flashplayer)
Key Maps / Exhibits
Alternatives
- Corridor 1
- Corridor 2
- Corridor 3
- Corridor 4
- SW 62nd Blvd Alternative from SW 20th Ave to Newberry Road
- Four Lane Urban Typical Section
- Four Lane Urban Typical Section With 2 Dedicated Transit Lanes
- Two Lane Rural Typical Section
- Alternative 1 (22-ft Median)
- Alternative 1 (Minimum Median)
- Alternative 2 (Phased 2-Lane)
- Alternative 2 (22-ft Median)
- Alternative 2 (Minimum Median)
- Alternative 3 (22-ft Median)
- Alternative 3 (Minimum Median)
- Alternative 4 (22-ft Median)
- Alternative 4 (Minimum Median)
- Alternative 4 (Phased 2-Lane)
Reports
- SW 62nd Blvd Fact Sheet
- Corridor Report
- Cover
- Inside Cover
- Table of Contents
- Section 1 - Summary
- Section 2 - Introduction
- Section 3 - Need for Project
- Section 4 - Existing Conditions
- Section 5 - Design Criteria
- Section 6 - Traffic
- Section 7 - Evaluation of Alternate Corridors
- Section 8 - Alternative Alignments
- Section 9 - Next Steps
- Appendix A - Transportation System Management Projects
- Appendix B - Typical Section Package
- Appendix C - Alignment and Right-Of-Way Requirements Ponds
- Appendix C - Alignment and Right-Of-Way Requirements SEG A
- Appendix C - Alignment and Right-Of-Way Requirements SEG B
- Appendix C - Alignment and Right-Of-Way Requirements SEG C
- Appendix C - Alignment and Right-Of-Way Requirements SEG D
- Appendix C - Alignment and Right-Of-Way Requirements SEG E
- Appendix D - Conceptual Stormwater and Floodplain Analysis
- Appendix E - Conceptual Bridge Hydraulics Analysis
- Appendix F - Conceptual Construction Cost Estimates
- Appendix G - Conceptual Right-Of-Way Cost Estimate
- Appendix H - Conceptual Utility Relocation Costs
- Appendix I - Natural Assessment Report
- Appendix J - Cultural Resources Overview Screening Report
- Appendix K - Air and Noise Report
- Appendix L - Preliminary Right-Of-Way Contamination Report
- Appendix M - Comments from the Effective Transportation Decision Making Process